OMNIA
CMMS + SSO/HSE
VIEW MODULE
MAINTENANCE + SAFETY
CMMS + SSO/HSE, OMNIA WORKSPACE MODULE

The asset that gets maintained is the one that protects.

Equipment record, maintenance plan and work order with real cost, with the IPERC matrix, EPP and work permits linked to the same asset and the same activity. One single master, two disciplines that cannot be separated.

Part of OMNIA Workspace, sold standalone or integrated with ITSM · AI · GRC.
The real problem

Maintenance and Safety are almost never bought from the same side, and that's why they never talk to each other.

The CMMS lives in one system, the SSO in another, and the work permit in an Excel spreadsheet. The result: EPP is issued without knowing which activity it's for, the permit is signed without knowing if the equipment has overdue maintenance, and the accident is investigated without the asset record on hand. In OMNIA, CMMS and SSO/HSE share the same asset master and the same activity catalog, closing both gaps at once.

58
Activities with IPERC matrix and checklist already loaded
1.020
Operational checklist items, per activity
50
Equipment types configured out of the box
7
Work permit types (PTW)
5
Levels in the hierarchy of controls, from elimination to EPP
INS·CSO
Legal indicators + days without an accident, on the same dashboard
Without integrated CMMS+SSO

Two masters, two truths

The equipment lives in one sheet, the EPP in another and the work permit in a hand-signed PDF. Nobody cross-checks the three before authorizing the work.

With OMNIA CMMS + SSO/HSE

One asset, one record

The equipment record, its maintenance plan, the IPERC matrix for its activity and the associated EPP are the same row of data, the work permit inherits it whole.

Asset maintenance
CMMS

The asset master, end to end.

One single module for machinery, vehicles, real estate and IT infrastructure, with the full maintenance cycle and its real cost.

Equipment record

Machinery, vehicles, real estate and IT infrastructure (servers, databases) in a single master, 50 configured equipment types, with hierarchy down to the part or component, coding/tag and multi-site.

CMDB · 50 TYPES · MULTI-SITE

Parts with useful life and condition-based strategy

Each part or component tracks its consumed useful life against the total; the maintenance strategy is defined by part and by condition, not only by the whole equipment, the signal to repair or replace.

USEFUL LIFE · PART + CONDITION

Maintenance plans (PAM)

Annual Maintenance Program triggered by time, usage or condition, the work order is generated automatically, by site and by provider.

PAM · TIME · USAGE · CONDITION

Work orders with actuals

Corrective, preventive or mixed, in-house technician, provider (Business Partner with KYC) or both on the same WO. Each order closes with its actuals: downtime, labor cost, parts cost and total cost, not an estimate.

DOWNTIME · LABOR · PARTS · TOTAL

FMECA / FMEA with RPN

Failure mode → cause → effect, with impact × probability calculating the RPN and classifying the asset as class A, B or C, criticality drives the plan, not the other way around.

FMECA · RPN · CLASS A/B/C

Predictive maintenance by regression

Regression on the asset's condition reading: it calculates in how many days it crosses the failure threshold and triggers the work order ahead of time.

REGRESSION · DAYS TO THRESHOLD

Metrology → automatic legal WO

Calibration certificates per instrument, fire extinguishers, scales, measurement and control instruments. When they expire, it doesn't just alert: it automatically generates the legal work order to bring it back into compliance.

CALIBRATION · AUTOMATIC LEGAL WO

Permit-based lockout (PTW/LOTO)

The work order doesn't start without a valid, signed work permit and lockout/tagout (LOTO), the system enforces it, not a paper procedure.

PTW · LOTO · BLOCKS THE WO

Parts: min, max and reservation

Each part has its reorder point and its reservation against the work order that already needs it, no competing for the same part between two WOs.

MIN/MAX · REORDER · RESERVATION

Indicators + bad actors

MTBF, MTTR, availability and reliability by equipment; a "bad actors" ranking to prioritize where to intervene first.

MTBF · MTTR · BAD ACTORS

Carbon footprint (Scope 1 and 2)

Scope 1 and 2 emissions calculated from the same consumption and the same maintenance activity, no separate spreadsheet for the sustainability report.

SCOPE 1 · SCOPE 2

Construction costs (MasterFormat CSI)

Construction work and infrastructure classified under MasterFormat (CSI), the same standard used by construction projects, inside the same asset master.

MASTERFORMAT · CSI
Occupational health and safety
SSO / HSE

Safety, on the same data as maintenance.

Risk matrix, EPP, accident rates and work permits, built on the same activity and the same asset that already lives in the CMMS.

IPERC risk matrix by activity

Hazard × activity, with controls and required EPP, 58 activities and 1.020 checklist items already loaded, ready to operate.

IPERC · 58 ACTIVITIES · 1.020 ITEMS

Mandatory EPP based on activity

The system validates the mandatory EPP based on the activity about to be performed, so every worker knows exactly what to wear before starting.

AUTOMATIC EPP · BY ACTIVITY

EPP kardex per worker

Size, signed receipt, useful life and next replacement, per worker and per item, traceable like any other issued asset.

KARDEX · SIZE · SIGNATURE · USEFUL LIFE

EPP validation by Augmented Reality

The phone's camera detects the EPP worn using markers on the body and issues a verdict, fit or NOT FIT TO OPERATE, before starting the task.

AUGMENTED REALITY · VERDICT

Hierarchy of controls (5 levels)

Elimination, substitution, engineering controls, administrative controls and EPP, EPP is the last level, not the first one offered.

5 LEVELS · ELIMINATION → EPP

Job Safety Analysis (JSA)

Job safety analysis per task, a direct input into the EPP validation and the work permit the activity will require.

JSA · PER TASK

Work permits (7 types)

7 permit types, linked to the asset and the work order: they inherit the procedure and the IPERC of the activity before authorizing entry.

7 TYPES · PTW · INHERITS IPERC

Single event: hazard, incident and accident

Hazard, incident or accident are the same event, with the injury marked on the body map, 7 impact dimensions, root cause analysis (RCA) and a CAPA plan that closes the loop by opening the WO in the CMMS or the ticket in Service Desk.

SINGLE EVENT · 7 DIMENSIONS · RCA/CAPA

Disciplinary notices

Disciplinary action linked to the finding or incident that triggers it, with a log and signature, traceable from the same record.

DISCIPLINARY · LOG · TRACEABILITY

Medical exams and protocols

Pre-employment, periodic and exit medical exams with their occupational medical protocol linked to the position and to the risk of the activity.

EXAMS · PROTOCOLS · POSITION

Planned inspections

Calendar of planned inspections by area and by risk, with findings that can open their own action plan.

INSPECTIONS · CALENDAR · FINDINGS

SST Committee + INS/CSO indicators

Legal and management dashboard: frequency and severity rates, SST committee compliance and a days-without-accident counter.

SST COMMITTEE · INS · CSO
Why they're joined at the hip

Whoever buys SSO needs the CMMS behind it.

EPP isn't issued "in the air": it's issued by activity, and that activity is the same row that triggers the maintenance plan. The work permit isn't signed without an asset: it inherits the procedure and the risk of the equipment about to be worked on. It's a single data graph, not two integrated products.

Equipment record + partsmachinery · vehicles · real estate · IT, down to the component
Maintenance planPAM + FMECA/RPN define the strategy per part
Work orderin-house · external · mixed, with actuals and permit-based lockout
ASSET +
ACTIVITY
SINGLE DATA
IPERC matrixhazard × activity, required controls
EPP + kardexautomatic validation by Augmented Reality
Work permitinherits IPERC, JSA and PTW/LOTO from the asset
gate: checklist gate: valid EPP / JSA gate: procedure (SOP) gate: permit (PTW/LOTO)

The same four gates open the work order and the work permit: the activity checklist, valid EPP or job safety analysis, the standard operating procedure (SOP) and the signed work permit/lockout (PTW/LOTO). If the asset doesn't have them up to date, neither the maintenance nor entry into the risk zone gets authorized.

Positioning

The other option is buying two suites and paying to make them talk to each other.

An EAM/CMMS like Maximo, SAP PM or Fracttal solves the asset. A separate HSE tool solves the risk. Neither one is born knowing about the other, the integration between the two is a project someone has to build and, afterward, maintain forever.

Traditional path
OMNIA CMMS + SSO/HSE
EAM / CMMSMaximo · SAP PM · Fracttal, owns the asset, blind to the risk
+
Separate HSE toolowns the risk, blind to the maintenance plan
+
Custom integration layersyncs assets, activities and permits between the two, and has to be maintained with every update
One single master: asset + activitythe CMMS triggers the plan and SSO/HSE inherits the EPP, the IPERC and the permit, with no syncing, because they were never separated
Differentiator

EPP validation by Augmented Reality, tied to the plan. No EAM and no generic HSE suite validates with the phone's camera that the correct EPP is being worn for that activity, at that moment, against the same maintenance plan and the same work permit. In OMNIA that validation isn't a separate app: it's part of the same asset record.

OMNIA Workspace module

One single module to maintain the asset and protect the person.

CMMS + SSO/HSE is sold on its own or integrated with the rest of OMNIA Workspace, ITSM, AI and GRC, on the same data model and the same governance layer.

ESEN